Cavanaugh surveyors provided construction staking for this new mixed-used building in the Arts District of Downtown Winston-Salem. The construction staking of this building required ultra-accuracy because of the 2-inch clearance of the building footprint to a neighboring building.
The scope included:
- Building foundation layout with necessary offsets, including columns
- Provide layout of under building, curb & gutter 5' offsets
- Stake entrance drives, parking, stormwater structures, provide on site benchmark and points for structural analysis
Cavanaugh also performed comdominium surveys for the residential and commercial condos inside the building. |
 |