Municipal Engineering
sanitary sewer projects
surf city, nc
|
|
Surf City Pump Station Improvements
- Modification of the island pump station, upgraded from 0.6 mgd to 1.0 mgd
- Replacement of three dry well wastewater transmission pumps with a combined total pumping capacity of approximately 1,750 GPM
- Replacement of all internal piping and hardware with stainless steel
- Replacement of existing pump motor controls with modern motor control center and variable frequency drive and replacement of the existing standby generator
- Delivered project under compressed time schedule
Surf City HWY 210 Force Main
- Design of 4” & 8” Force Main to run along HWY 210 and tie into Force Main along HWY 50
- 15,000 LF constructed with minimal available right-of-way space and multiple stream crossings
Surf City Parallel Force Main
- Design and permitting of 17,000 LF of parallel 12” force main along HWY 50
|
 |
 |
Project Highlights
Surf City Parallel Force Main
- Bid under construction cost estimate by $275,000 ($1.1 million vs. $825,000)
Surf City Highway 210 Pump Station
- Designed, permitted and constructed under schedule. Survey began April 2005, construction substantially complete December 2005
Surf City Highway 210 Force Main & Pump Station
- Designed, permitted and constructed under schedule.
- Survey began April 2005, construction substantially complete December 2005
Surf City Island Pump Station
- Designed, permitted and constructed under schedule.
|
 |
 |
|
|
 |
|