Municipal Engineering

nanofiltration Water Treatment Plant

belhaven, nc

  • Provided final designs for 500,000 GPD nanofiltration water treatment facility
  • A value-engineered design to decreased the overall cost of this new facility
  • Performed start up of the plant
  • Developed operational procedures and Standard Operating Procedures
  • Operated the facility for the first month after start-up
Project Highlights

Cavanaugh engineers and operators converted a complicated control system proposed for the plant to an open architecture control system, simplified to better meet the needs of the facility, reducing maintenance and operational costs of the system