Construction Administration

 

water Treatment Plant improvements

belhaven, nc

Cavanaugh provided the final designs and helped the Town decrease the overall cost of this new 0.5 MGD water treatment facility.

This project included an on-site 300,000-gallon above ground storage tank along with repairs to an existing elevated tank. Cavanaugh also designed the replacements for 2,500 LF of small diameter waterlines. These waterlines also have an inner-County connection with a valve vault and meter to provide backup water to citizens in Belhaven and Beaufort County, should the need arise.

Cavanaugh provided full-time construction observation for this series of projects.